When installing the distribution box on the wall with a thickness of 240mm, the back of the box shall be recessed into the wall for not less than 20mm, the back wall shall be nailed with a asbestos board with a thickness of 10 mm or a steel wire with a mesh of 10 mm. When installing the distribution box on the wall with a thickness of 240mm, the back of the box shall be recessed into the wall for not less than 20mm, the back wall shall be nailed with a asbestos board with a thickness of 10 mm or a steel wire with a mesh of 10 mm. Due to the long time interval between the embedding of the box and the installation and wiring of the box panel, the box shall be disassembled with the box cover (door) and the panel first, and marked for storage, so as to prevent the electrical components and the box cover (door) from damage or. Why do we need to hang a layer of mesh before plastering the wall? This is not a superfluous move, but the key to preventing cracking! The workers are working on the fiberglass mesh hanging process, first positi. more Why do we need to hang a layer of mesh before plastering the wall? This is not a. At the junction between the back of the fire box and the wall on the wall of the public walkway, it is recommended that the back of the fire box be covered with steel mesh. The first four hanging nets are for different materials to form a whole under the constraint of the steel wire mesh, so that. Take time and care in hanging the first strip of Mesh Membrane as this acts as the reference point for the rest of the strips. Hang the first strip so that the studded edge with no mesh is adjacent to the next strip to be hung (overlap strips so that the Mesh is continuous, or overlap by 3 studs if. This is a UK and ROI specific subreddit, r/DIY has a lot of US Specific content, things like products to use, where to get them, laws and codes that don't apply to the UK. r/DIYUK is for UK and ROI specific DIY help, questions and projects.